Long time in winter hibernation...... Well the suspension is now on and currently sat at track torque awaiting them setting her up. Went for Gaz coilovers with some different springs to what they come with standard, not sure on the lB but supposed to improve them, AST top mounts and then here is the list of routine maintenance.....
Air con delete kit, new alternator, new power steering hoses, fully polybushed front end, everything that power flex do went on. New discs and Ds2500 pads, uprated fluid, braided hoses, new Abs sensors on both sides. New bearings on both sides. New driveshafts, cv joints, and track rod ends, new radiator, hell of a lot of new nuts and bolts that kept destroying themselves. New ultra lite alloys with 595RSr tyres, Erm..... Think that's almost it.
Been for MoT and it has a clean fresh ticket for 12 months

so hoping.... Ready next week and she is ready to clock up some track miles. Just the bit of bodywork tidying and the colour change should be done in June while am on holiday